Historically Sensitive Site: Crown Castle's Communication Antenna Project
Crown Castle was in need of instillation of communication antennas in a historically sensitive site.
AFS 1300
The Need
Crown Castle needed to install communication antenna on a 90’ pole in a historically sensitive site. In addition, the site had a small footprint and accessible only over a wooden bridge with a maximum weight of 8 tons. ARE’s foundation and pole system also needed to meet local requirements for aesthetics and paint color.
Overview
Thanks to its Hydraulic System, ARE’s AFS 1300 system can be installed without a crane, in tight spaces, and with limited impact on the environment. Foundation and pole pieces were ferried across the bridge and assembled on site. ARE’s crew installed the system in a 3 days which included OSHA approved railings and ladder, demonstrating ARE’s ability to customize our systems to meet nearly any customer needs.
Project Benchmarks
- Crew flexibility and equipment availability allowing for installation under time constraints
- Limited space and access
- Above ground foundation required no digging on bed of rock
Project Resources
- 4-person crew
- 3 days
- Skid-steer
- Telehandler
- Local fill used for ballast
Challenges
- Limited space and access
- Quickly deployed in rain and wet conditions
- Rock base
- Foundation parts brought across 8T max weight bridge
Level site for foundation
Set your king-post and attach base trays
Attach truss arms onto base trays
Attach side walls and add ballast
Attach pole sections and raise pole with ARE Hydraulic Ram system