Ballasted Systems AFS 130 AFS 200 AFS 255 LT AFS 350 AFS 400 AFS 600 AFS 1300 AFS 1350 AFS 1400 AFS 1700 AFS 1800 AFS 3000 Direct Embedment Poles 25ft-80ft Hydraulic Tilt-Up Poles 25ft-150ft Conventional Poles Raising Systems Hydraulic Rams Screw-Jacks Gin Poles Antenna Mounts 36" Dual Platform T-Arm 20" Dual T-Arm 20" Universal Pipe 12"-24"-36" T-Arms and CollarsRooftop Ballasted Mounts
5'/1.5m Rooftop Ballasted 6.5'/2m Rooftop Ballasted Accessories Adjustable Grate Platform Standing Platform Pedestal Cabinet Chain Link Fencing Kit 5 Rung Ladder (AFS 1100 - 1300) 7 Rung Ladder (AFS 1700 - 3000) Chain Mount Ladder Pole Jacking Bracket Tuf-Tug Safety Cables Climbing Pegs Anchor Bolts AFS Bolt SetsRelocatable Poles for Mining: Northwest Towers at Cote Mine
ARE Telecom was contracted by Northwest Towers to install multiple poles in an open-pit mine near Ontario, Canada.
AFS 350
The Need
Northwest Towers was in need to install several poles across Cote Mine. One of the key challenges faced by Cote Mine was establishing a robust and reliable communication network across their expansive mining site. They were in need of a solution that could provide stable support for their communication equipment, withstand harsh weather conditions, allow for easy installation and maintenance, and a system that allows for relocating as mining locations change.
Overview
Thanks to ARE Telecom’s expertise and innovative solutions, Northwest Tower deployed 7 AFS 350 systems to provide stable and reliable communication throughout the mine. This has improved safety, coordination, and productivity resulting in more efficient mining operations.
Project Benchmarks
- Pre-assembled in ARE yard resulted in fast installation and less time installing during winter months
- Above ground foundation required no digging
- Customization and flexibility
- Permanent or temporary
Project Resources
- 2-man crew
- 1 day
- Telehandler
Challenges
- Limited space and access
- Need to relocate system
- Extreme weather conditions
- Highly regulated Canadian Mine industry standards

ARE trailer loaded with 2 AFS 350's

Offload truck using a telehandler

Set foundation in place

Once foundation is set, add system components

Set pole on foundation and raise with ARE's 20T raising system