Space-Saving Solution with US Cellular

US Cellular was in need of a long-term, temporary pole while the city's water tower was being repaired.

AFS 1300

Ballasted System - 100' Conventional Pole
Manly, Iowa
US Cellular
Completed Installation

The Need

ARE Telecom was contracted by US Cellular to install a long-term, temporary pole for their relocation while the cities water tower was being repaired.

Overview

After analysis using US Cellulars loading, ARE determined our patented AFS 1300 Ballast Foundation System would support the 2-tiers of antennas and fit easily within the limited space available for the relocation.

Project Benchmarks

  • ARE supplied all engineering analysis, structural certifications, and antenna mounts for a turn-key solution
  • Installation was completed on a short notice and completed before deadline
  • ARE universals quad mounts were used featuring clips that holds arms while being bolted for an easy, one man installation while on the pole.

Project Resources

  • 4-man crew
  • 3-day assembly
  • Skid-steer
  • Hand tools
  • Crane

Challenges

  • Short turn around time to install
  • Small footprint
  • Rural location with limited tool and equipment availability

1 Level Surface

Create a level surface using gravel or aggregate

2 King Post Assembly

Place king-post in center of leveled ground and set trays around

3 Assembled Legs

Assemble each leg to the king-post using washers and nuts, leaving nuts loose

4  Fill Ballast

Attach sidewalls and fill with ballast

5 Deploy Pole

Attach pole sections with crane