Ballasted Systems AFS 130 AFS 200 AFS 255 LT AFS 350 AFS 400 AFS 600 AFS 1300 AFS 1350 AFS 1400 AFS 1700 AFS 1800 AFS 3000 Direct Embedment Poles 25ft-80ft Hydraulic Tilt-Up Poles 25ft-150ft Conventional Poles Raising Systems Hydraulic Rams Screw-Jacks Gin Poles Antenna Mounts 36" Dual Platform T-Arm 20" Dual T-Arm 20" Universal Pipe 12"-24"-36" T-Arms and CollarsRooftop Ballasted Mounts
5'/1.5m Rooftop Ballasted 6.5'/2m Rooftop Ballasted Accessories Adjustable Grate Platform Standing Platform Pedestal Cabinet Chain Link Fencing Kit 5 Rung Ladder (AFS 1100 - 1300) 7 Rung Ladder (AFS 1700 - 3000) Chain Mount Ladder Pole Jacking Bracket Tuf-Tug Safety Cables Climbing Pegs Anchor Bolts AFS Bolt SetsQuick Installation on Wenatchee Mountains
Crown Castle was in need of a 80' self-raising pole to support communication AT&T antennas on a remote mountain top.
AFS 1300
The Need
ARE Telecom was contracted by Crown Castle to design, manufacture, and install our AFS ballasted foundation system and tilt-up/self-raising monopole to support communication AT&T antennas on a remote mountain top in the Wenatchee Mountains.
Overview
ARE designed the pole and matched it with our AFS 1300 foundation system. The site location was difficult to access and relied on a rarely used US forestry road. All components were transported by small truck or telehandler. Although bad weather made the mountain pass and path icy and overall installation difficult, foundation and pole were off-loaded and installed within 3 days. The self-raising pole made it possible for the antennas to be installed on the ground and did not require additional equipment or dangerous climbing. This versatile quick install system sits above ground and has a small footprint of 15’. It is certified to TIA 222 rev G and used for both permanent or temporary installations.
Project Benchmarks
- Crew flexibility and equipment availability allowing for installation under challenging conditions
- Tight time constraints
- Tight footprint without use of crane
Project Resources
- 3-person crew
- 3 days
- Skid-steer
- Telehandler
Challenges
- Limited space and access
- Significant logistics planning due to remote site in an isolatd mountain range
- Quickly and efficiently deployed over 3 days
AFS will arrive in a container to offload
Set your king-post and attach base trays
Attach truss arms onto base trays and attach side walls
Fill foundation with local ballast
Attach pole sections and raise pole with ARE Hydraulic Ram system